• Cedars-Sinai Hospital Solar Installation

  • Solar Installation Cedars-Sinai Hospital

    Stellar Solar is proud to announce the February, 2013 activation of a solar car-port system that is part of the new Cedars Sinai LEED Platinum expansion. The system incorporates 1,100 SunTech 240 watt panels in multiple locations atop the hospital parking garage in the heart of Beverly Hills and utilizes 30 SMA Sunnyboy inverters. Graycore Construction was the general contractor assisting with this project.

  • Number of Modules: 1,100

    DC System Size (kW): 285 kWp

    Install year: 2013

    Physical Address: 

    Monitoring: 2 X Satcon 500kW Inverters

  • Home » Cedars-Sinai Hospital