San Diego Cardiac Center selected Stellar Solar to design and install a solar energy system in order to reduce their energy costs. “As a leading cardiac center in San Diego, we saw this as an important opportunity to also demonstrate our environmental leadership and save a significant amount of money,” said Dr. Ron Miller, MD., of the San Diego Cardiac Center. “This was as much of a financial decision as it was an environmental one; we found we could produce our own solar electricity onsite for a cost that was about 70% lower than what SDG&E charges us. That said, we are very pleased to be contributing to cleaner air in San Diego and a healthier population.”
Number of Modules: 255 x Trina 230W modules
DC System Size (kW): 60 kWp
Install year: 2011
Physical Address: 3131 Berger Ave #200, San Diego, CA 92123
Monitoring: 5 SMA-7000 and 3 SMA-6000 inverters